03 December 2024 - Mission Day: 10595 - DOY: 338
Gallery
 
 

Views of the spacecraft: -Various SOHO images from the time that ESA engineers were building the spacecraft. Besides the work performed at Matra Marconi facilities, the SOHO spacecraft was prepared for launch at the SAEF-2 facility of the Kennedy Space Center before being fueled and encapsulated on top of the Atlas-Centaur AC-121 on pad 36B.

Downloads

 
 

• European Site • US Site

 

Feedback & Comments: SOHO Webmaster

Last modification: July 27, 2020

SOHO
and
SOHO
SOHO is a project of international cooperation between