J.-C.Vial presented plans for the MEDOC campaign in weeks 21--23 (19 May - 8 June) (see annex 5). CDS expressed reservations about the duration; would prefer 2 rather than 3 weeks. SUMER will support campaign, but requested back-up at the EOF. UVCS did not yet have a clear picture of the interface between MEDOC and EOF; plans to have the lead observer at the EOF for one week and at MEDOC for two weeks.
After some discussion, the SWT unanimously endorsed the MEDOC campaign to take place for 3 weeks in week 21 -- 23.