File swan_sheet1.txt -- Last modified Fri Aug 25 10:36:39 1995 COMMISSIONING PHASE BLOCK SHEET 1. INSTRUMENT AND BLOCK NUMBER: SWAN, Block 1 2. BLOCK IDENTIFICATION: SWAN Early Switch-on 3. PURPOSE: Prepare for geocorona and moon observations 4. SUB-BLOCKS: (see Note 1) NR. IDENTIFICATION 1.1 Initial Switch-on 1.2 Launch Lock Actuation and Mechanism Head Orientation 1.3 Deep Sky Observation and High Voltage Adjustment 1.4 Hydrogen Cell Verificaton 5. SUB-BLOCKS TABLE: (see Note 2) NR. - DURATION - PREVIOUS - COMMANDING - TELEMETRY - POINTING 1.1 00:03 N/A PRO M None 1.2 00:25 Nom. NRT-d M Nom. 1.3 02:00 Nom. NRT-d M Nom. 1.4 00:20 X 1.3 Nom. NRT-d M Nom. 6. SCHEDULING REQUIREMENTS: (see Note 3) Sub-block 1.1 preferably on day 3, latest on day 5. Sub-block 1.2-1.4 preferably on day 4, latest on day 5. Sub-block 1.1 one day (>18 hours) before 1.2 to monitor HK 7. SPECIAL REQUIREMENTS: (see Note 4) Requires coordination with FOT; science obs. low priority in early orbit. Sub-block 1.2 and subsequent only if no thruster activation planned for next two days, and if sensor unit temperatures above -10 C (to be checked in orbit). 8. SUCCESS CRITERIA AND/OR EXPECTED OUTPUT: SWAN on, HK normal, meaningful scientific data collected 9. RELEVANT PROCEDURES: n_ts_nm_sw_on 10. CROSS-REFERENCE TO TEST SHEETS: (list identifiers for test sheets) SWAN 1 (SU1 Launch Lock Activation for +Z face) SWAN 2 (SU2 Launch Lock Activation for -Z face) 11. RELEVANT SECTION OF TIMELINE (backpage) Structure of this memo: Block number: purpose a. Preferred time as day & hour:minute from launch b. Earliest time c. Latest time d. Estimated duration without contingency in hours:minutes e. Where can it be broken into parts f. Relevant procedures to be run by FOT g. Prerequisites h. Importance as scale 1 (highest) to 3 (lowest) General: The order of the first 3 blocks is fixed Wherever possible additional NRT telecommands are mentioned, usually 1 or 2 OBDH block commands for on-line adjustments are planned Block 1.1: Initial switch-on a. 3 & 00:00 b. 3 & 00:00 c. 4 & 00:00 d. 00:03 e. not at all f. n_ts_nm_sw_on g. SOHO is in transfer phase, no thruster activations planned for next 2 days h. 1 Block 1.2: Launch Lock Actuation and Mechanism Head Orientation a. 4 & 00:00 b. 4 & 00:00 c. 5 & 00:00 d. 00:25 e. between SU+Z and SU-Z lock actuation and before head orientation f. Critical OBDH-block-commands to be sent by FOT: NBLLOCKN,1; for SU+Z in case of problems: NRT session with special IWS procedure, sending OBDH-block command NBLLOCKR,1 automatically in 20 sec time difference 12 times Command to be sent by FOT: NBLLOCKN,2; for SU-Z in case of problems: NRT session with special IWS procedure, (command NBLLOCKR,2) g. Block 1.1 was successful, no thruster activations planned for next 2 days, at least 2 hours of RT-contact available, sensor unit temperatures are above 0 deg h. 1 Block 1.3: Deep Sky Observation and High Voltage Adjustment a. 4 & 02:25 b. 4 & 02:25 c. 5 & 12:00 d. 02:00 e. after 10 minutes any time f. NRT-commanding only, about 15 OBDH block TCs with about 10 words each g. Block 1.2 was successful, no thruster activation planned for 2 hours, at least 2 hour RT-contact available h. 1 Block 1.4: Hydrogen Cell verification a. 4 & 04:25 b. 4 & 03:25 c. 5 & 12:00 d. 00:20 e. After about 10 min. between SU+Z and SU-Z verification f. NRT-commanding only, 2 OBDH block TCs with about 10 words each g. Block 1.2 was successful, no thruster activation planned for 1 hour, at least 30 min RT-contact available h. 1