SOHO Transfer Trajectory Phase - SVM


SVM EARLY CHECKOUT

  1. System level checkout

    The following system level checkout activities will take place in the very early TTP (test sheet numbers are shown in brackets):

  2. Subsystem level checkout

    The early orbit checkout activities at subsystem level are the following:

SVM COMMISSIONING

System level commissioning

The system level commissioning activities are the following:

Subsystem level commissioning

The subsystem level commissioning activities are the following:


Last modification: December 07, 1995