Action 28-1:
On European PIs: All the instrument teams are required to check if
their flight software and ground software is Y2K compatible. The US
PIs have already done this. The European PIs are requested to
report back to L. Sanchez before mid July.
Current status:
Action 27-1:
On PIs to provide input to what the instruments plan to do during the
Mercury transit.
Action 27-3:
On EIT team to provide documentation on their roll determination
method by end of March.