Action 20-1: On PIs to determine if the new computation of the spacecraft velocity in heliocentric coordinates is correct. (Samples can be found at http://sohowww.nascom.nasa.gov/ data/ancillary/orbit/definitive/new_samples). Input to L. Sanchez by September 6.
Action 20-2: On ESA to provide a detailed script for the station keeping/momentum management maneuver on 11-12 September, including window for SSU/SEU patch upload and testing. Due date: 30 August.
Action 20-3: On ESA/Matra, MDI and VIRGO to analyse S/C pointing disturbances.
Action 20-4: On PS to establish Working Group to study technical matters of telemetry redistribution with relevant parties (EIT, CDS, SUMER, UVCS, S/C).
Action 20-5: On PS to organize series of small workshops at SOHO EAF.