WEEKLY MEETING MINUTES Week 32, 5 Aug - 11 Aug, 2002 1. Announcements ---------------- * PMI contractors are scheduled to perform preventive maintenance on the UPS-15 system on August 9 from 8:30AM until 4:30PM. The UPS system will be in bypass and the load will be on commercial power during this activity. No impact to operations is expected. 3-UPS-15 supports SOHO, WIND/POLAR and XTE missions. 2. Operations Constraints ------------------------- * CALSO-5 SEM Calibration Rocket (ICAL12) is scheduled to launch at 18:30 UT on Tuesday 6 August. SSR will be in record from 17:50-19:30 UT. * Commanding times for the week: Monday - Gap until 15:40 then D16 all day. Tuesday - Gap until 15:30 then D27 until 19:30 then D16. Wednesday - Gap until 15:10 then D27 all day. Thursday - Commanding is good all day. Friday - Commanding is good all day. Saturday - Gap until 16:20 then D16. Sunday - Gap from 14:10-18:40 then D16. 3. Coordinated Observations --------------------------- M Aug 05 (W32) CDS/HIDA Collaboration (#6882), 22-08 UT, POC: David Brooks High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi T Aug 06 ICAL 12 SOHO/CALSO-5 Cross Calibration (#6886), CELIAS-SEM/CDS/EIT/TIMED, 18:30 UT, POC: Don McMullin CDS/HIDA Collaboration (#6882), 22-08 UT, POC: David Brooks High Cadence AR Studies (#6885), RHESSI/SacPeak/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi W Aug 07 CDS/HIDA Collaboration (#6882), 22-08 UT, POC: David Brooks High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi T Aug 08 CDS/HIDA Collaboration (#6882), 22-08 UT, POC: David Brooks High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi F Aug 09 High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi S Aug 10 High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi S Aug 11 High Cadence AR Studies (#6885), RHESSI/SacPeak/CDS/TRACE/MaxMill, POC: Luca Teriaca/Gianna Cauzzi Other activities for Week 32: * Aug 3-7 UVCS Observations of the Northern Coronal Hole * Week 32 JOP136 Default RHESSI Collaboration (#6850), POC: Stein Haugan * Week 32 JOP159 CME's in Lyman-alpha (#6870), SWAN/LASCO/EIT/UVCS, POC: Chris St Cyr, Eric Quemerais * Week 32/33 Intercal 1, CDS/EIT, POC: CDS Planner * Aug 8-16 UVCS Coordinated Observations with RHESSI or JOP159 Targets of Opportunity (TOO) Submodes: Submode 6 Planners for Week 32: CDS -- James McAteer MDI -- Sarah Gregory EIT -- Alex Young SUMER -- not observing LASCO -- Ops Team UVCS -- John Kohl/John Raymond TRACE -- Dawn Myers/Karel Schrijver Relevant Notes -------------- CDS: HIDA collaboration, High Cadence AR study, ICAL12, and possibly a post-CME dimming study. UVCS: Coronal hole study and synoptics until Wednesday, then RHESSI or JOP159 support and synoptics.. LASCO: C2/C3 synoptics and hourly C2 pB images, JOP159 Wednesday - Friday. EIT: 195 CME watch and synoptics. MDI: Full disk magnetograms and dopplergrams. Doing calibrations on Monday. TRACE: High cadence AR study. AOB: ---