WEEKLY MEETING MINUTES January 26 - February 1 1. Announcements ----------------- Continue planning around DSS-27 next week. 2. Operations Constraints ------------------------- * DSN schedule: Continuous contact. There are several downlink only stations next week, in particular on Tuesday, NRT will end at ~ 5:20 pm local time prior to acquiring the downlink only station: Jan 27, Tuesday: 06:45 - 14:15 DSS-63 22:30 - 03:40 DSS-45 Jan 28, Wednesday: 06:45 - 14:15 DSS-65 Jan 29, Thursday: 12:30 - 14:15 DSS-65 Jan 30, Friday: 06:55 - 12:45 DSS-65 * Submode Switches: Will be in Submode #6 all week. 3. Coordinated Observations ---------------------------- Planned observations include: M Jan 26 (W05) JOP074 (#4030), Filaments and their Environments, 8-12 UT, VLA/Nobeyama/SXT/EIT/CDS/MDI/LASCO, POC: N. Gopalswamy (gopals@fugee.gsfc.nasa.gov) JOP077 (#4040), UVCS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin T Jan 27 JOP077 (#4040), UVCS/CDS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin W Jan 28 JOP077 (#4040), UVCS/CDS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin T Jan 29 JOP077 (#4040), UVCS/CDS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin F Jan 30 JOP077 (#4040), UVCS/CDS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin S Jan 31 Flight of XUV Doppler Telescope aboard ISAS sounding rocket, (#4035), Scheduled Launch: 4:30 UT. Window: 4:00 - 6:00 UT CDS/EIT/MDI/UVCS/LASCO/SXT/XUV Doppler Telescope, EOF Coord: Joe Gurman Japan POC: Hirohisa Hara (hara@solar.mtk.nao.ac.jp) S Feb 01 TR Maintenance/Memory Dumps JOP077 (#4040), UVCS/CDS/LASCO Time Evolution of Streamers 15:15 -01:00 UT, POC: Richard Frazin Other Activities for Week 05: * CDS, Jan 26-28 from 19-24 UT, Real-Time Engineering Operations * MDI high-cadence helioseismology, synoptic magnetograms every 96 minutes Submodes: Submode 6 all week Planners for Week 05: SOL - Jeff Newmark CDS - Eddy Breeveld SUMER - SUMER OFF/No Planner UVCS - Richard Frazin EIT - Jeff Newmark MDI - Julia Saba LASCO - George Simnett Relevant notes: --------------- CDS: Real time operations are planned with real-time engineering tests on Monday, Tuesday and Wednesday monitored from Rutherford for data quality. The data will processed here at Goddard and then immdiately mirrored to RAL. Wednesday and Thursday: CME onset study to continue as before. LASCO: Tuesday night through Friday will do C2 campaign at high time cadence looking for evolution of CMEs. EIT: Doing normal synoptic full sun sets and CME watch in 195 only. Due to NRT problems with DSS-27 not planning on being be able to run 171/195 ratio observations next week. No support for JOP77 and JOP74 (Monday). MDI: Need 1 hour of VC2 for a monthly calibration, probably Friday evening. Rocket Flight: Launch scheduled for Friday night at 4:30 UT, reaching greatest height at about 4:44 UT. For LASCO, FeXIV line and C1. For CDS pointing for the rocket flight, Joe Gurman will contact Bill Thompson with target regions by Friday noon.