SOHO Daily Meeting Minutes for Friday 04 December 2009 (DOY 338) Prepared by: Emily Zamkoff ANNOUNCEMENTS ------------- * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml * FOT is planning an anomaly & emergency test of the ground system automation for the week beginning 7 Dec. The test will be run on the simulator and will cause notifications to be sent also to the instrument teams. The test will be run during a gap between actual contacts. Date and exact time remain TBC. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Thu. (3 Dec), FSM collect, Nominal, NRT ~ 1830 Fri. (4 Dec), RSL, VIRGO Planned Activities: Nominal Upcoming Operations: Nominal Ground Anomalies: AR# G09-0157 338/0130 No TLM/CMD D34 - Transmitter RED - Lost 0136, 0312, 0448 Magnetograms (Overwrite) - Lost 227 minutes of TLM (SSR Recoverabe) - Lost 308 minutes of CMD Nighttime NRT for Today and Tomorrow: See FTP'd activity plan Instrument STATUS ----------------- CDS: Nominal. East limb AR study with EIS, QS spectral atlas. Weekend: QS spectral atlas, QS latitude scan with EIS, AR on east limb with EIS, off-limb coronal study, QS spectral atlas, AR monitoring. UVCS: Nominal. Coronal hole study. LASCO: Nominal. C2/C3 synoptics, C2pB for tomography reconstruction. EIT: Nominal. 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and Dopplergrams. TRACE: Nominal. Observing NE limb bright coronal region, irradiance scans near equator with Hinode. Questions, corrections, and updates: soc@esa.nascom.nasa.gov