SOHO Daily Meeting Minutes for Friday 17 October 2008 (DOY 291) Prepared by: Emily Zamkoff ANNOUNCEMENTS ------------- * The delayed command load submission system on the ECS computers is working now but needs testing before it can be used. Please be in touch with the SOCs if you need to send a load. * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Nominal Daily Activities Planned Activities: VIRGO, RSL Upcoming Operations: 10/16 - 10/19 MDI continuous operations Ground Anomalies: 290/2200 (10/16) - TM/TC Dropouts due to D46 RED (123 minutes TM lost, all recoverable except 15 minutes; 131 minutes MDI continuous data/time lost) Nighttime NRT for Today and Tomorrow: See ftp'd activity plan(s) INSTRUMENT STATUS ----------------- CDS: Nominal. JOP189/HOP88 (#7292), TR emission in ARs for today and the weekend. Also doing X-Ray bright point onset study on Saturday. UVCS: Nominal. Instrument characterization. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics, JOP 189/HOP88 (#7292). MDI: Nominal. High resolution extracted magnetograms, Dopplergrams and filtergrams, JOP189/HOP88 (#7292). TRACE: Nominal. JOP189/HOP88 (#7292), QS for HOP90, observing solar limbs, observing AR11005. Questions, corrections, and updates: soc@esa.nascom.nasa.gov