SOHO Daily Meeting Minutes for Friday 16 March 2007 (DOY 075) Prepared by: Emily Zamkoff ANNOUNCEMENTS ------------- * RHESSI default target, http://solar.physics.montana.edu/hypermail/mmmotd/ HINODE operations, http://www.isas.jaxa.jp/home/solar/hinode_op/ STEREO operations, http://stereo-ssc.nascom.nasa.gov/plans.shtml FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: 074/1931 (3/15) One single DMA Fail over 1 format Accomplished Activities: Nominal Daily Activities, TR off, MDI Planned Activities: Nominal Daily Activites, VIRGO, SWAN, New Guide Star Upcoming Operations: None Ground Anomalies: 074/194348 (3/15) Corrupted Commands (Total delayed commanding due to NRT pauses is 27 minutes 28 seconds) 074/1850 (3/15) Loss of TLM Delayed Commanding - RFI (2 hours 28 minutes degraded TLM, 4 minute command delay) DR#G107576 INSTRUMENT STATUS ----------------- CDS: Nominal. Joint polar study (#7199), engineering. Weekend: joint polar study (#7199), cds off-limb polar study. SUMER: Engineering. UVCS: Nominal. Joint polar study (#7199). LASCO: Nominal. C2/C3 synoptics, C2/STEREO COR2 calibrations, joint polar study (#7199). EIT: Nominal. Half resolution 195 CME watch and synoptics. MDI: Nominal. Full disk magnetograms and continuum. TRACE: Nominal. Joint polar study (#7199). Questions, corrections, and updates: soc@soc.nascom.nasa.gov