SOHO Daily Meeting Minutes for Monday 31 October 2005 Prepared by: NASA SOC's ANNOUNCEMENTS ------------- * The current RHESSI default target is on AR10818. When selecting this target to maximize coordination w/others, use campaign number 6850. * The PDU-15 switch-off will be take place at 12 UT. FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: DOY 301 Uplinked delayed loads: SWAN, VIRGO RSL Table Nominal daily activities DOY 302 Uplinked delayed loads: MDI, CELIAS Nominal daily activities DOY 303 Uplink load: NONCOHO Nominal daily activities Planned Activities: Uplink delayed load: SWAN Acquire new tracking star Upcoming Operations: None Ground Anomalies: 303/2225 Loss of telemetry due to occultation by the moon (DSS27) - 22 minutes of lost telemetry - 1.5 minutes unrecoverable - remainder covered byD46, 15 minute command outage, unable to transition to VC3 for station handover. INSTRUMENT STATUS ----------------- CDS: Nominal. JOP171 (#7160), tomorrow: AR loop study, synoptics and engineering. UVCS: Nominal. Suprathermal seed particle population measurements study. LASCO: Nominal. C2/C3 synoptics. EIT: Nominal. 195 CME watch and synoptics, spectroscopy and imaging tomography of solar fibrils study (#7161). MDI: Nominal. High Resolution observations, JOP171 (#7160), spectroscopy and imaging tomography of solar fibrils study (#7161). TRACE: Nominal. JOP171 (#7160). Also, reminder that TRACE will load only 3 days a week starting this week, Monday, Wednesday and Friday.