SOHO Daily Meeting Minutes for Friday 25 March 2005 ANNOUNCEMENTS ------------- * The current RHESSI default target is AR10745. When selecting this target to maximize coordination w/others, use campaign number 6850. * The SPWG will be on TUESDAY March 29 after the daily meeting FOT REPORT ---------- Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: Uplink delayed load SWA050323081, Transponder swap (Keyhole Configuration script, Step 4), HGA Table, Keyhole loads Planned Activities: Uplink delayed load VIRA50326, RSL Table, UVCS Recovery Upcoming Operations: None Ground Anomalies: 083/1338 Loss of command (DSS66) due to incorrect command modulation index - 6 minute command outage, unscheduled 5 minute recording on SSR - interrupting planned SSR dump. 083/1456 sh4xt1 logged out - cause unknown - unable to use sh4xt1 to monitor spacecraft parameters for 7 minutes during pass. 83/2230 Late AOS (DSS14) due to antenna controller interface - delayed SSR dump 40 minutes, increased SSR recording time, unplanned transition to medium rate, had to delete- replan-reload some keyhole timetag loads, unplanned use of intermittent record. 084/0045 CMS would not schedule load - delayed replanning efforts for 1.5 hours. SOLAR STATUS & TARGETS ---------------------- See http://soho.nascom.nasa.gov/soc/statustargets.html INSTRUMENT STATUS ----------------- CDS: Nominal. Engineering, synoptics, and lube studies. Normal weekend studies on Saturday, GIS meridian study on Sunday. UVCS: Nominal. Safed for keyhole. Part 1 of recovery today. Tomorrow: part 2 of recovery then Faraday Rotation Measurements, synoptics. LASCO: Nominal. C2/C3 synoptics, JOP159, Faraday Rotation Measurements. EIT: Nominal. In bakeout. MDI: Nominal. 96 minute magnetogram cadence, full disk magnetograms and continuum when VC2 is available. TRACE: Nominal. Observing AR10745. Daily full disk mosaics while EIT is in bakeout.