SOHO Daily Meeting Minutes for Wednesday 30 June 2004 ANNOUNCEMENTS ------------- * The ECS software will be taken down shortly to reverse the configuration changes made yesterday. We expect to have everything back up in time for the next pass (this evening). The EOF routers will need rebooting during the afternoon. * In the current configuration of the ECS computers, we can not reconnect machines for telemetry without stopping and starting telemetry distribution to everyone. That means we cannot necessarily reconnect a machine at a moment's notice - it will depend on what other teams are doing. Please bear this in mind before taking down your telemetry connections to the ECS. * The ECS Office software was taken down during the pass today and the data has been requested. * Please plan all commanding for this week with the SOCs as NRT is very tight. * The current RHESSI default target is AR10639. When selecting this target to maximize coordination w/others, use campaign number 6850. * The transponder swap to put us back on the HGA has been successfully completed. FOT REPORT ---------- Spacecraft Status: Nominal - HGA Keyhole through 3 Jul Spacecraft Anomalies: None Accomplished Activities: Keyhole operations, nominal activities Uplink delayed load: SWA040628111 Nominal HGA Table, RSL Table Acquire new tracking star Planned Activities: Swap to nominal transponder, Keyhole operations Acquire new tracking star Uplink delayed load: MDI01118 Upcoming Operations: MDI continuous operations (4 Jul - 5 Sep) Ground Anomalies: 181/1947 - Incorrect keyhole timetag load uplinked (no impact) Other: SOLAR STATUS ------------ 06/29 DOY 181 - 06/30 DOY 182 LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Coronal hole study on the north pole. Tomorrow: observing AR10638. UVCS: Nominal. UVCS is in a safe configuration for the SOHO keyhole until Thursday. Observations will resume on Saturday. LASCO: Nominal. Improved cadence C2/C3 synoptics, JOP159. EIT: Nominal. EIT is in bakeout through the keyhole. Bakeout ends on Sunday at 10 UT; observations resume at 21 UT. MDI: Nominal. Full disk magnetograms and dopplergrams when VC2 is available. TRACE: Nominal. Irradiance variations study with La Palma on AR10640, full disk mosaics, engineering.