SOHO Daily Meeting Minutes for Monday, 5 August 2002
ANNOUNCEMENTS
-------------
* RHESSI and High Cadence AR Study target for today is AR 0039/44;
target for tomorrow is AR 0057.
* Router maintenance work scheduled for this morning has been
postponed possibly until Wednesday.
* The IPNOC needs to perform emergency maintenance on both TLAN routers
that will result in a complete outage. The planned time frame is
Wednesday 8/7/02 from 10AM to 11AM. This will effect the SOHO,
WIND/POLAR, XTE, ACE, TRMM, SOTA, TSM, and ICE missions.
* CALSO-5 SEM Calibration Rocket (ICAL12) is scheduled to launch
at 18:30 UT on Tuesday 6 August. SSR will be in record from
17:50-19:30 UT.
* PMI contractors are scheduled to perform preventive maintenance
on the UPS-15 system on August 9 from 8:30AM until 4:30PM. The
UPS system will be in bypass and the load will be on commercial
power during this activity. No impact to operations is expected.
3-UPS-15 supports SOHO, WIND/POLAR and XTE missions.
* TRACE movies are auto-generated for each GOES event
http://www.lmsal.com/solarsoft/last_events/
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies:
214/2234 CEPAC ESU Data Request Error; recovered
autonomously after three minutes.
Accomplished Activities:
DOY 214: VIRGO, SWAN, CELIAS, RSL
DOY 215: VIRGO, CELIAS
DOY 216: VIRGO, NONCOHO_02216
Planned Activities: VIRGO
Upcoming Operations: None
Ground Anomalies:
216/0750 Commanding activities delayed five minutes due to
D54 using the wrong sweep parameters when uplinking
to RCVR #2.
216/1630 Direct voice lines down 1 hour 10 minutes.
Operations performed via the black phone.
SOLAR STATUS
------------
08/02 DOY 214 - 08/05 DOY 217
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020805.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
TRACE X1 and M6 movies:
ftp://diapason.lmsal.com/pub/shine/xflare03aug2002.mpg
ftp://diapason.lmsal.com/pub/shine/mflare04aug2002.mpg
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. HIDA collaboration and High Cadence AR Study.
Tomorrow: ICAL12.
UVCS: Nominal. Coronal hole study and synoptic for today and
tomorrow.
LASCO: Nominal. C2/C3 synoptics and hourly C2 pB images.
EIT: Nominal. 195 CME watch and synoptic. Will take extra synoptics
at 18, 18:30, 19 UT tomorrow for ICAL12.
MDI: Nominal. Full disk magnetograms and dopplergrams, calibrations
and campaign tests today.
TRACE: Nominal. High Cadence AR Study on AR0039 today and on AR0057
tomorrow.