SOHO Daily Meeting Minutes for Wednesday, 26 June 2002
ANNOUNCEMENTS
-------------
* RHESSI target for today is AR 0008; target for tomorrow
is TBD.
* The next talk in the Dynamics of Flux Ropes Lecture
Series will be on Thursday at 11am in Building 26, room G-10.
The topic will be: "Lagrangian Description of a Flux Rope."
* Visitors will come to the EOF on Thursday June 27 around 3pm
and Friday 28 June around 11am.
* SPWG Friday at 2pm in the EAF. Please get calendar changes
to the SOC as soon as possible.
* SSR dump on Friday will be delayed until the end of the D16
pass.
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies:
176/1700 CDS mnemonic CTM24 violated YL limits from 17:00:37
until 17:31:35. Impacts TBD.
Accomplished Activities: VIRGO, RSL
New control star, mag = 2.95
Planned Activities: VIRGO
Upcoming Operations: 1 July ACU/CDMU Memory Dumps
Ground Anomalies:
177/0226 Low uplink power at D46 resulted in the inability
to command for 11 minutes.
177/0537 No monitor data received for 4 hours 13 minutes due
to a SCP failure at D66.
177/0700 SH4WS2 monitor died. Operations failed over to
String #5.
177/0945 Lost 2 minutes 14 seconds of CMD and TLM due to
operator error at D66. Data is recoverable from
the SSR.
SOLAR STATUS
------------
06/25 DOY 176 - 06/26 DOY 177
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020626.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. Active region studies and polarity reversal studies.
Tomorrow: polarity reversal study and RHESSI support.
UVCS: Nominal. Cassini conjunction and mini-synoptic.
Tomorrow: 24-hour synoptic.
LASCO: Nominal. C2/C3 synoptics, JOP159 support.
EIT: Nominal. 195 CME watch and synoptics.
MDI: Nominal. Full disk magnetograms and dopplergrams.
TRACE: Nominal. Continued support of RHESSI, observing AR0008.