SOHO Daily Meeting Minutes for Wednesday, 10 October 2001
ANNOUNCEMENTS
-------------
* VAULT launch (JOP148) has been postponed until sometime in the
first two weeks of March.
* Maintenance will be performed on the UPS-20 system on October
11 from 9AM until 4PM. No impact to operations is expected.
* There may be a fire drill this week.
* SOHO web pages will be inaccessible due to system maintenance on
the ESA servers, starting Friday and ending late Saturday.
* For latest details about next week's MEDOC campaign, see:
http://www.medoc-ias.u-psud.fr/
and go to the MEDOC Campaign #8 and the MEDOC calendar
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: VIRGO, RSL, New Guide Star (7.15 mag)
Planned Activities: VIRGO, SWAN, New tracking star (7.6 mag)
Upcoming Operations: None
Ground Anomalies:
282/1758 - TC outage; D24 CPA lost interface (8 minutes)
283/0357 - TC outage; D34 swapped CPA (5 minutes)
283/0533 - TM Dropout; D34/JPL Comm line problem (3 minutes, recoverable)
283/0810 - Late AOS at D66; Cause unknown (2 minutes, recoverable from SSR)
283/0844 - Degraded TM from D66; Cause unknown (181 minutes, recoverable)
SOLAR STATUS
------------
10/09 DOY 282 - 10/10 DOY 283
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20011010.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html
INSTRUMENT STATUS
-----------------
CDS: Nominal. JOP149, JOP131, sunspot oscillations study. Tomorrow:
ICAL, engineering studies, particle beam study on AR 9653, and
polar studies.
UVCS: Nominal. Coronal hole observations in the north and synoptic for
today and tomorrow.
LASCO: Nominal. C2 and C3 synoptics.
EIT: Nominal. 195 Angstrom CME watch and synoptics, supporting JOP149.
ICAL tomorrow.
MDI: Nominal. Full disk magnetograms and dopplergrams, supporting
JOP149.
TRACE: Nominal. JOP131 and JOP149 today.