SOHO Daily Meeting Minutes for Monday 20 December 2004 ANNOUNCEMENTS ------------- * The current RHESSI default target is AR10713. When selecting this target to maximize coordination w/others, use campaign number 6850. * Maneuvers are tomorrow * EOF network maintenance on Thursday 23 December during a gap. * Friday is a holiday. There will be someone in the SOC office from 15-19 UT. * Saturday is a holiday. There will be someone in the SOC office from 18 UT until 00 UT the following day. FOT REPORT ---------- Spacecraft Status: Nominal Keyhole Configuration Spacecraft Anomalies: None Accomplished Activities: DOY 352 VIRGO, SWAN, MDI keyhole load, Intermittent record timetag loads DOY 353 CELIAS, Intermittent record timetag load DOY 354 CELIAS, Intermittent record timetag load Planned Activities: CELIAS, MDI keyhole load, Intermittent record timetag loads Upcoming Operations: 21 Dec - SK/MM/Roll maneuvers 13-29 Dec - HGA keyhole operations Ground Anomalies: 352/1422 Extraneous command at D66 during SVM commanding 352/1508 TM Dropout; D63 had to swap downlink channel (30 minutes, recoverable from CDR) 353/2135 Late AOS; D34 misconfigured to uplink to spacecraft RCVR-1 (24 minutes, recoverable from SSR) SOLAR STATUS ------------ 12/17 DOY 352 - 12/20 DOY 355 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20041220.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Safing for maneuvers. Recovery on Thursday. UVCS: Nominal. In a safe configuration for the keyhole. LASCO: Nominal. Safing for maneuvers. Recovery on Thursday. EIT: Nominal. Bakeout for the keyhole. MDI: Nominal. 3 ALT magnetograms per day at 00, 08, 16 UT. When VC2 is available, taking full disk magnetograms and continuum. TRACE: Nominal. Full disk mosaics, observing an AR to east and just south of the equator. On Thursday, TRACE will be loading through Tuesday.