SOHO Daily Meeting Minutes for Wednesday 10 March 2004 ANNOUNCEMENTS ------------- * The current RHESSI default target is AR10570. When selecting this target to maximize coordination w/others, use campaign number 6850. * Tuesday through Thursday parking availability anywhere close to Building 26 will be very limited due to the SDO PDR. * Solar Science Seminar today at 3:30 PM, Bldg. 26, Rm. G-10. Mike Marsh (U.Central Lancashire) will speak on "Propagating Oscillations Within Active Region Loops -- Coordinated Observations with SOHO/CDS and TRACE" FOT REPORT ---------- Spacecraft Status: Nominal Inverted Roll Position Spacecraft Anomalies: None Accomplished Activities: CELIAS, RSL Planned Activities: CELIAS, new tracking star, mag = 7.2 Upcoming Operations: Keyhole Operations begin 3/19 Ground Anomalies: 069/2253 Lost 1 minute 45 seconds of unrecoverable TLM due to RFI at D27. Other: None SOLAR STATUS ------------ 03/09 DOY 069 - 03/10 DOY 070 EIT daily On-Line Solar Status and observations: http://umbra.nascom.nasa.gov/eit/plan/log_form20040310.html LASCO daily On-Line Solar Status and observations: http://lasco-www.nrl.navy.mil/observations/Todays_obs.html Web Page for Planning: http://www.bbso.njit.edu/arm Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/ INSTRUMENT STATUS ----------------- CDS: Nominal. Loop variability study, engineering, Oslo sunspot study. Tomorrow: loop variability study, GIS spectral atlas, Oslo sunspot study. UVCS: Nominal. Streamer study and synoptics. LASCO: Nominal. C2/C3 synoptics and JOP159. EIT: Nominal. 195 CME watch, synoptics and JOP159. MDI: Nominal. Full disk magnetograms and dopplergrams, supporting the quasi-steady coronal loops study. TRACE: Nominal. Loop variability study and quasi-steady coronal loops study.