SOHO Daily Meeting Minutes for Friday 28 February 2003
ANNOUNCEMENTS
-------------
* Current RHESSI default target is the AR coming over the NE limb
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: VIRGO, NOM HGA
Planned Activities: RSL, VIRGO, SWAN
Upcoming Operations: 3/6 TR Maintenance
Ground Anomalies:
058/1157 6.75 hours degraded TM. D66. Reason unknown. Nonrecoverable.
058/1808 Wayward command. 7 minutes NRT delay. 10 commands retransmitted.
SOLAR STATUS
------------
02/27 DOY 058 - 02/28 DOY 059
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20030228.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. AR intensity study, engineering, CME onset study.
Saturday: Prominence observations, CME onset on AR10290,
off-limb study at the south pole. Sunday: off-limb study at
the north pole, engineering, AR flare/diagnostics, EUV
intensities study.
UVCS: Nominal. Flat field calibration and synoptic. Weekend:
coronal hole observations and synoptic.
LASCO: Nominal. C2/C3 synoptics, JOP159.
EIT: Nominal. 195 CME watch and synoptics, JOP159.
MDI: Nominal. High resolution magnetograms and dopplergrams.
TRACE: Nominal. Observing QS in the MDI high res field of view.