SOHO Daily Meeting Minutes for Wednesday 18 December 2002
ANNOUNCEMENTS
-------------
* Current RHESSI default target is AR 10226
* SPWG on Friday after the weekly meeting in the EOF
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: VIRGO, CELIAS, RSL, New Guide Star (4.6 Mv)
Planned Activities: VIRGO, CELIAS
Upcoming Operations: None
Ground Anomalies:
351/2051 - TSTOL crashed on POCC String 5 workstation 2
352/0628 - Degraded TM at D66; Cause unknown (230 minutes,
recoverable)
SOLAR STATUS
------------
12/17 DOY 351 - 12/18 DOY 352
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20021218.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. Line width study, AR mapping in the south, AR on the
limb study. Tomorrow: line width measurements above the limb,
map of the large active region complex in the Northern
hemisphere.
UVCS: Nominal. Coronal hole observations and synoptic.
LASCO: Nominal. C2 and C3 synoptics, JOP159.
EIT: Nominal. 195 CME watch and synoptics, JOP159.
MDI: Nominal. High resolution 3 variable campaign through Friday.
TRACE: Nominal. Observing AR10229/10225 for today and tomorrow.