SOHO Daily Meeting Minutes for Friday, 27 September 2002
ANNOUNCEMENTS
-------------
* RHESSI default target for today is AR 10134; target for tomorrow
is TBD.
* SPWG today at 2pm in the EAF
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities: VIRGO, Nominal HGA Table
Planned Activities: VIRGO, SWAN, RSL
Upcoming Operations: None
Ground Anomalies:
269/1707 A TCP failure at D16 resulted in commands being
corrupted and rejected by the spacecraft. Unable
to command for 27 minutes , delaying pass
activities.
269/1745 Incorrect monitor data received for 42 minutes from
D16. POCC was receiving monitor data from TCP2
(being used for TLM), and should have received
monitor data form TCP1 (being used for CMD).
269/2210 Corrupted command delayed NRT activities 8
minutes. All commands successfully retransmitted.
SOLAR STATUS
------------
09/26 DOY 269 - 09/27 DOY 270
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020927.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning:
http://www.bbso.njit.edu/arm
INSTRUMENT STATUS
-----------------
CDS: Nominal. Quiescent AR loop diagnostics on AR10119, CME
onset watch on the west limb. Saturday: coronal hole spectral
atlas and CME onset watch on the west limb. Sunday: quiescent
AR loop diagnostics on AR10132.
UVCS: Nominal. Coronal hole observations and long synoptic.
Weekend: Coronal hole observations and mini-synoptic.
LASCO: Nominal. C2/C3 synoptics, JOP159.
EIT: Nominal. 195 CME watch and synoptics, JOP159.
MDI: Nominal. High resolution magnetograms and binned dopplergrams,
supporting La Palma. Switching to a 3 variable campaign on
Sunday.
TRACE: Nominal. La Palma observations in the MDI high res field
of view.