SOHO Daily Meeting Minutes for Friday, 26 January 2001
ANNOUNCEMENTS
-------------
- Reminder:
Sunday, 28 January, the EAF network will be down from noon until
midnight. If you have any filesystems on the archive filers that are
hard mounted (i.e., not automounted) on your machines -- you should
unmount those file systems before noon Sunday, or you may be
hampered by "stale file handles."
If, however, your mounts are accomplished via automount, you
probably need take no action, and your system will recognize the
file systems when the EAF/SDAC network becomes available again.
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies: None
Accomplished Activities:
VIRGO, Nom. HGA Table, Acquired new tracking star, mag = 6.4
Planned Activities: VIRGO, CELIAS, RSL
Upcoming Operations:
1/29 TR Maintenance
2/8 Off-pointing Maneuvers
Ground Anomalies:
1624 Corrupted command triggered a TC Block Length Error. NRT
activities delayed six minutes as six total commands retransmitted.
SOLAR STATUS
------------
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20010126.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/obs20010126.html
INSTRUMENT STATUS
-----------------
CDS: Nominal. Yesterday at 19 UT, CDS was back up and running.
Today, particle beam study on AR9313.
UVCS: Nominal. Today the study with Ulysses continues in the South.
Saturday - 24-hour synoptics. Sunday - Ulysses study in the South.
LASCO: Nominal. C2 and C3 synoptics.
EIT: Nominal. 195 Angstrom CME watch and synoptics.
MDI: Nominal. Today MDI looks at sunspots in high resolution mode.
Then MDI will return to doing full disk magnetograms and
dopplergrams through the weekend.
TRACE: Nominal. Will continue on AR 9313 through the weekend.