SOHO Daily Meeting Minutes for Monday, 10 July 2000
Chaired by: L. Roberts(SOC)
Notes: S. Gregory (MDI)
DOY: 192
ANNOUNCEMENTS
--------------
Reminder, tomorrow continuous contact ends and we will soon have more
QKL files to compare (present system vs. new SOHODPS system).
The QKL file we previously asked teams to compare (APID_000616_*QKL) has been
deleted from the ECS system ... but we have another new quicklook file
with data from July 7 (APID_000707_14*QKL) for you to examine.
FOT REPORT
----------
Spacecraft Status: Nominal
Spacecraft Anomalies:
189/1725 CDS Red Limit Violations CUGHV1 and CUGHV3
Accomplished Activities:
Day 189: Virgo, Celias, Swan, RSL
Day 190: Virgo, Celias
Day 191: Virgo, NONCOHO
Planned Activities: Virgo, Time-tagged VC2, New tracking star
Upcoming Operations: 7/18 Momentum Management and Stationkeeping maneuver
Ground Anomalies:
190/2227 107 minutes VC3 lost. D24. SCP failed to record VC3. 1 magnetogram lost.
191/0155 11.5 minutes ranging lost. D46. Correlation problem required rephasing.
192/0410 2 minutes 18 seconds late AOS. D66. Horizon mask error. Recoverable.
192/0815 1.3 minutes TM outage. 4.7 min CMD outage. D66. Antenna stopped tracking
for reason unknown. TM Nonrecoverable.
SOLAR STATUS
------------
There were two M class flares this weekend:
Sunday, July 9
7980 + 0715 0723 0726 GO8 5 XRA 1-8A M5.7 1.7E-02 9077
Monday, July 10
8420 1026 1056 1143 GO8 5 XRA 1-8A M1.1 5.7E-02 9077
07/07 DOY 189 - 07/10 DOY 192
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20000710.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2000/obs20000710.html
INSTRUMENT STATUS
-----------------
TRACE: Nominal. JOP125 support on AR9070, tomorrow more JOP125 support with
either AR9070 or AR9077.
CDS: Nominal. Full Sun Spectral Study, tomorrow Polarity Reversal Study
both North and South poles.
SUMER: Nominal. JOP125 Support.
UVCS: Nominal. Cross Calibrations in Lyman Alpha and O VI.
LASCO: Nominal. C2/C3 Synoptics.
EIT: Nominal. JOP 125 support.
MDI: Nominal. Full Disk Magnetograms and Dopplergrams today and tomorrow
with Monthly Calibrations for 2 hours tomorrow.