20 January Daily Mtg. Minutes FOT Briefing ------------- Spacecraft Status: Nominal Spacecraft Anomalies: 1443 Star Swap. Successfully executed CS-23 (Star Swap Recovery). Accomplished Activities: VIRGO, CELIAS Planned Activities: VIRGO, New HGA Table Upcoming Operations: TR Maint. Scheduled for 2/1/00. Ground Anomalies: 0256 D46 declared RED. AOS late by ~60 min. No data loss. 0332 Big Pipe Failed. Degraded or lost TLM for ~60 min. Data recoverable. No MDI high rate during support. 1059 SCP failed at D66. Lost 2 min of data, unrecoverable. Instrument Plans ----------------- CDS -- CDS will not be supporting Flare Genesis tomorrow. They will be looking at AR8833 with MDI (in the MDI high resolution field-of-view. LASCO and EIT -- nominal, synoptics and EIT CME watch continues. MDI -- will look at AR8833 in the high resolution FOV then switch back to full disk. Flare Genesis -- Brigitte Schmieder was in the EOF today. The longest the campaign can continue is until 28 January. She explained the uncertainty in the end date was due to a number of reasons, the winds were slower, computer reboots, etc.