Subject: Daily Meeting Minutes, 23 July 1997 FOT Briefing ------------ S/C status is nominal. Anomaly summary: 203/1341 -- RCVR2 toggling while ranging Accomplished Activities: RSL, VIRGO, CELIAS, SWAN Planned Activities: RSL, VIRGO, CELIAS (2030) 8/1 - Memory Dumps and TR Maintence (6 hours) 8/31 - 9/4 Maneuver Activities (Gyro Cal, MM, Roll, MM, SK, RW4) Ground System Anomaly Summary: ------------------------------ 203/1200 -- Multiple RCVR 1 sweeps required at DSS-24 (50 minutes) 203/1358 -- Unexpected TC Mode 4 error (5 minute -- NRT pause) 203/1431 -- TM Dropout during ranging (10 minutes, unrecoverable) 203/1558 -- Lost VC4 during ranging (12 minutes, unrecoverable) 203/2015 -- TC Block Sequence Errors during NRT 203/2358 -- TM Dropout; D46 equipment problem (15 seconds, unrecoverable) 203/0603 -- Multiple RCVR1 sweeps required at D66 (25 minutes) 203/0650 -- TM Dropout during VC4 dump (16 seconds, recoverable ?) INSTRUMENT STATUS ----------------- CDS: Nominal. Today: off-limb (W) observations. Later: wide slit at Sun center. Tomorrow: AR study, polar corona study (pole TBD) SUMER: Nominal. Today: Ly spicule study, test of Tenerife campaign. Tomorrow: Ly spicule study. SUMER is executing a light observational load to reduce counts on the detector. UVCS: Nominal. Today: Ly-alpha offlimb at 1.1-1.5 Rsun using offset pointing. LASCO: Nominal. The new OBE software has been loaded, and testing will begin with today's NRT. EIT: Nominal. Baking out. Probable synoptic image set tomorrow, if the new OBE software permits. MDI: Nominal. Extra hr. VC2 requested tomorrow, ~18:00 UT, to perform image re-centering on the CCD. AOB: None