11/02/1996: Daily meeting, chaired by Eliane Notes taken by VIRGO/ C. Frohlich FOT report: S/C nominal Thermo-elasticity test about on schedule: 03:20 started 50% of OSR Instrument Status: GOLF: nominal, observing temperature changes VIRGO: nominal, test LOI cover during cooling down to OSR 0% and later MDI: nominal, taken a lot of data SUMER: observing N-limb; temperature slightly too high (25 instead of 24) CDS: nominal, testing gracing incidence detector system EIT, LASCO: nominal; EIT will take again a synoptic picture this afternoon UVCS: nominal; taking pictures before and after the temperature changes SWAN: left; everything ready for HOI CELIAS: nominal COSTEP, ERNE: not present Today's activities: continuation of thermoelestaic tests and see above Tomorrow's activities: NRTs after 14h30 as on schedule