MINUTES FOR DAILY PLANNING MEETING AUGUST 29, 1996 Chaired by: Laura Allen / Ted Tarbell Notes: UVCS (Rai Wu) ANNOUNCEMENTS: Weekly Meeting at 10:30 after daily tomorrow. FOT BRIEFING: Spacecraft Status: Nominal, no anomalies, CTOF still powered off Ground system anomalies: 241/1740 - Front end card stopped processing telemetry; 2 minutes of telemetry missed at POCC only. False TC block sequence error generator 241/1840 - Failed carrier transfer D27 -> D24. 8 minutes of no commanding 241/2020 - POCC string 2 crash -> 20 minutes of near real time lost PACOR: Nothing to report INSTRUMENT STATUSES MDI - Nominal full disk campaign starting this morning magnetograms, and velocity extractions will look at 3/4 of the disc from north towards the south, including the active region CDS Nominal conducting observations of sunspot, active region filament, and equatorial coronal hole will need to plan times for JOP 48 SUMER Nominal, took observations of Rho Leo will study the active region will support JOP 001 during La Palma time UVCS Nominal Synoptic and special observations continue - will move to PA of 195 for special obs. have obtained intensities and line profiles out to 2 solar radii using data collected over the last week LASCO Nominal Rebooted at 1834 yesterday Alpha Leo leaving C3/2? field of view EIT Nominal have good temporal resolution (30/40 sec per frame) for sunspot movie ready for JOP 001 tomorrow, did sunspot oscillation study A.O.B. LASCO has changed the way they scale their images in the summary data. Solar wind measurements can be obtained from the following URLs: http://umtof.umd.edu/pm http://space.rice.edu/~urquhart/wind.html