8 August 1996 Daily Planning Meeting Minutes Chaired by: Piet Martens Notes: UVCS (Joseph Michels) Announcements ------------- none FOT Report ---------- S/C Nominal. No spacecraft anomalies. Accomplished activities: RSL, VIRGO Planned activities: RSL, VIRGO, SWAN, Nominal HGA table Commanding test DOY 221 21:00 UT - DOY 222 04:00 UT Ground System Anomalies: 220/1400 Multiple VC4 Frame sequence errors, FOT feels that the problem is between JPL and GSFC. 221/0015 TM Dropout during D24-D42 handover (3 min unrecoverable) 221/0736 Multiple VC4 Frame sequence errors Instrument Status ----------------- CDS - Nominal. Today filament and prominence study. Tomorrow 3.5 hr engineering activity and testing of coronal hole sequence. SUMER - Nominal. Today: vertical MHD wave study test and active region reference spectrum. JOP 44 begins on 10 August. UVCS - Nominal. Today and tomorrow: ENE quadrant. LASCO - Nominal. Today and tomorrow: synoptic observations with line scans. (FeX, FeXIV, NaI) EIT - Nominal. Images from JOP001 retrieved and are on the web. Hope to begin high rate portion of JOP001 today at ~1500 UT MDI - Nominal. Running JOP001 sequence all day