Notes for April 26,1996 Daily Meeting Announcement: Air Conditioning is back on. FOT: S/C nominal at 21:30 and 22:31 bunch of errors caused by commands dropped somewhere along the lines. Commands were resent. All OK. Uplink glitch caused 3 min data lost (unrecoverable) another 1 min data lost (recoverable). DSN: NRT back at 15:25 Status: MDI: Will do another VC2 dump today. SUMER: Nominal. Studied some explosive events. Did not run JOP12 because commands not loaded correctly. CDS: Software Memory Problem. Will reboot today. Have supported JOP12 and will run JOP28. EIT: Nominal. Run synoptic program. Did not support JOP20. LASCO: Have reloaded previous versiom of code for JOPS and comet next week. New software had timing problems. C1 was not operated. Saw large event on West Limb yesterday. Will do full frame images today to follow it. SWAN: Doing full sky mapping with and without Hydrogen Cell. UVCS: Doing 1/2 synoptic and 1/2 spectral survey. other experiment: no reps. Intercal 002 cancelled for tomorrow. The Daily Meeting tomorrow will be held at 12:00 noon.