2 September 1998
Pipe heating continues. All the pipe heaters are currently switched on
in sun-heating mode. Three of the Dual Thruster Modules (DTMs) appear
to be thawed. Pressures in the tank and two propulsion branches are as
predicted and steady.
A test was performed on receiver #1 on the +Z low gain antenna. Lock
was not achieved.
A four step approach has been adopted for the attitude recovery:
- Gyro test
- Thruster test
- Despin of the S/C to low rate
- Triggering of ESR
Details are being discussed by AOCS experts at GSFC, MMS-F Toulouse
and MMS-UK Bristol. The schedule for these activities depends on the
completion of thawing of the propulsion system and the time needed
to fully recharge the batteries.
Bernhard Fleck
SOHO Project Scientist
European Space Agency
bfleck@esa.nascom.nasa.gov
Last modification: September 08, 1998