SOHO DAILY REPORT Operations Day - 271/2007 (28 Sep 07) Mission Day 4319 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-070928 ==================================================================== PASS #1 Madrid DSS66 0544-1245 PASS #2 Canberra DSS46 1931-2240 ******************************************************************** PASS #1 Madrid DSS66 0544-1245 Anomalies: G07-0229 0613 ~3 min TM loss (unrecoverable), antenna controller problem. DR M104434. NRT: 0555-0629 0650-0658 0702-1055 1202-1222 Activities Summary: - SSR Dump - Collected MDI-M (0631-0645) - Collected MDI-H (0645-1225) - Uplinked delayed loads VIRA70929, SWA070927071 - CRS Drift Estimation Update - Collected ranging data - SSR Record ------------------ PASS #2 Canberra DSS46 1931-2240 Anomalies: G07-0230 1940 ~15.5 min CMD loss, transmitter problem. DR C105890. NRT: 2037-2101 Activities Summary: - SSR Dump - Collected MDI-M (1958-2013) - RSL Table Upload - Uplinked delayed load MDI01453 - SSR Record ------------------ -- End of Report --