SOHO DAILY REPORT Operations Day - 214/2006 (02 August 06) Mission Day 3897 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-060802 ================================================================== PASS #1 Madrid DSS66 0835-1125 PASS #2 Goldstone DSS27 1517-215/0021 PASS #3 Canberra DSS46 215/0010-215/0645 ******************************************************************** PASS #1 Madrid DSS66 0835-1125 Anomalies: None NRT: None Activities Summary: - SSR Dump - Collected MDI-M (1057-1121) - Uplinked load: TTD66_06214 - SSR Record ------------------ PASS #2 Goldstone DSS27 1517-215/0021 Anomalies: G06-0231 214/1534 Delay of daily SVM activities due to corrupted commands. K_RWMN_DYLADJ and A_CRS_DRFT_EST both restarted and successfully completed. G06-0232 214/1753 NRT commanding stopped due to corrupted command. Delayed NRT commanding by 9 minutes, 8 NRT commands successfully retransmitted. G06-0233 214/0846 No DSN 0158 MON data due to MIA/SFG interface problem. 994 minutes of monitor data loss. DR#'s N103826, N103827. NRT: 1609-1644, 1647-1753 1753-2136, 2141-2220 Activities Summary: - SSR Dump - Collected MDI-M (1646-215/0010) - Collected MDI-H (215/0010-215/0021) - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update ------------------ PASS #3 Canberra DSS46 215/0010-215/0645 Anomalies: G06-0234 215/0338 Loss of TLM and CMD due to TCP problem. Lost 6.3 minutes of telemetry (non-recoverable), lost 12.5 minutes of command ability. DR# C105140 NRT: None Activities Summary: - Collected MDI-M (215/0525-215/0630) - Collected MDI-H (215/0010-215/0525) - OBT Distribution to CELIAS, SWAN - CDMU RAM Memory Dump - SSR Record - Executed CS-14: Loss of TM in High Rate ------------------ -- End of Report --