SOHO DAILY REPORT Operations Day - 070/2004 (10 March 04) Mission Day 3022 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-040310 ==================================================================== PASS #1 Madrid DSS66 0823-1425 PASS #2 Goldstone DSS16 1858-2210 PASS #3 Canberra DSS46 2205-071/0210 ********************************************************************* PASS #1 Madrid DSS66 0823-1425 Anomalies: None NRT: None Activities Summary: - SSR Dump - Collected MDI-M (1049-1120) - Collected MDI-H (1120-1405) - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update - SSR SEF Reset - SSR Record ------------------ PASS #2 Goldstone DSS16 1858-2210 Anomalies: G04-0112 2119 Corrupted command between D16 and the spacecraft delayed NRT activities 3 minutes. G04-0113 2129 Received degraded TLM from 2129 to 2210 due to a defective 5MHz timing cable at D16. Any lost data is unrecoverable. DR #G104140. NRT: 1918-2139 Activities Summary: - SSR Dump - Collected MDI-M (2054-2145) - Collected MDI-H (2145-2210) - Uplinked delayed load CEL040310301 - New Tracking Star Slot 2/ Magnitude 7.4 - SSR SEF Reset ------------------ PASS #3 Canberra DSS46 2205-071/0210 Anomalies: G04-0114 2210 D46 unable to maintain uplink lock on RCVR-1. Lost 4 hours of range data, and delayed commanding activities 52 minutes. DR #C103418. NRT: None Activities Summary: - Collected MDI-M (2307-0150) - Collected MDI-H (2205-2307) - SSR SEF Reset - SSR Record ------------------ -- End of Report --