SOHO DAILY REPORT Operations Day - 334/2003 (30 November 03) Mission Day 2921 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-031130 ==================================================================== PASS #1 Madrid DSS66 0538-1412 PASS #2 Goldstone DSS27 1354-2140 PASS #3 Canberra DSS46 2123-335/0605 ********************************************************************* PASS #1 Madrid DSS66 0538-1412 Anomalies: None NRT: None Activities Summary: - SSR Dump - Collected MDI-M (0731-0746) - Collected MDI-H (0746-1412) - OBT Distribution to SWAN, CELIAS - SSR SEF Reset (1x) - FSM Data Collection - Executed C-06: CDS MCP Voltage Alarm ------------------ PASS #2 Goldstone DSS27 1354-2140 Anomalies: G03-0790 2023 Lost telemetry on string 4 due to IRTS 3 failure - 2 minutes of telemetry on prime string during pass- recoverable NRT: None Activities Summary: - Collected MDI-M (1435-2125) - Collected MDI-H (1354-1435, 2125-2140) - Uplinked delayed load NONCOHO_03334 - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update - SSR SEF Reset (1x) ------------------ PASS #3 Canberra DSS46 2123-335/0605 Anomalies: S03-0062 335/0105 LASCO/EIT Sector Wheel Motor hung - approximately 2.5 hours of LASCO/EIT science data lost. G03-0791 335/0547 Degraded telemetry after disabling coherency - 22 minutes of degraded telemetry - unrecoverable, delayed completion of pass activities for 10 minutes. NRT: 335/0228-335/0345 Activities Summary: - Collected MDI-M (2151-335/0200) - Collected MDI-H (2123-2142, 2149-2151, 335/0200-335/0605) - Collected Ranging Data - OBT Distribution to SWAN, CELIAS, UVCS - SSR SEF Reset (2x) - SSR Record - Executed L-03: LASCO/EIT Sector Wheel Hung ------------------