SOHO DAILY REPORT Operations Day - 267/2002 (24 September 02) Mission Day 2489 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-020924 ==================================================================== PASS #1 Canberra DSS46 0114-0750 PASS #2 Goldstone DSS27 1521-268/0125 ********************************************************************* PASS #1 Canberra DSS46 0114-0750 Anomalies: None NRT: None Activities Summary: - Collected MDI-H (0114-0730) - Min/Max Data Collection (PROS) - OBT Distribution to SWAN, CELIAS - SSR SEF Reset (x2) - SSR Record ------------------ PASS #2 Goldstone DSS27 1521-268/0125 Anomalies: G02-0491 2050 Lost 14 minutes 44 seconds of TLM and CMD due to a SCP failure at D27. Data is recoverable from the CDR. DR #G101609. G02-0492 2219 Intermittent loss of telemetry from 2219 to 2351 (total of 4 minutes and 36 seconds). Lost data is unrecoverable. DR #G101612. NRT: 1857-1950 2357-0019 Activities Summary: - SSR Dump - Collected MDI-M (1537-1605, 1852-0055) - Uplinked delayed loads VIRA20925, SWA020924121, CEL020924301 - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update - RSL Table Upload - SSR Record - Executed CS-14: Loss of TM in High Rate (x2) ------------------ -- End of Report --