SOHO DAILY REPORT Operations Day - 033/2002 (02 February 02) Mission Day 2255 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-020202 ===================================================================== PASS #1 Canberra DSS46 0127-0825 PASS #2 Madrid DSS54 0830-1604 PASS #3 Goldstone DSS27 1552-034/0142 ********************************************************************* PASS #1 Canberra DSS46 0127-0825 Anomalies: G02-0049 0025 FDF link intermittently dropped out resulting in some attitude data failing to reach FDF. G02-0050 0242 Antenna went off-point because of a problem with the predicts. Triggered STD MON 30. Lost 3 min 48 sec of TLM, 9 min of MDIH data, and 19 min of range data. DR #C100875. G02-0051 0505 Transmitter tripped, causing STD MON 30 to trigger on the spacecraft. Lost 1 min 52 sec of TLM, 9 min of MDIM data, and 21 min of range data. DR #C100876. G02-0052 0658 Antenna struck by lightning. STD MON 30 triggered. Lost 1 min 58 sec of TLM, 2 min of MDIM data, and 20 min of range data. DR #C100877. NRT: None Activities Summary: - Collected MDI-M (0431-0520. 0529-0713) - Collected MDI-H (0127-0431, 0520-0529, 0713-0810) - Min/Max Data Collection (PROS) - OBT Distribution to SWAN, CELIAS - Collected Ranging Data - SSR SEF Reset (x5) - Executed CS-14: Loss of TM in High Rate (x3) - Executed CS-21: RCVR1 Lock Loss/Std Mon 30 Triggered (x3) ------------------ PASS #2 Madrid DSS54 0830-1604 Anomalies: None NRT: None Activities Summary: - SSR Dump - Collected MDI-M (0905-0920) - Collected MDI-H (0920-1540, 1547-1604) - Uplinked delayed load VIRA20203 - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update - Collected Ranging Data - SSR SEF Reset ------------------ PASS #3 Goldstone DSS27 1552-034/0142 Anomalies: None NRT: None Activities Summary: - Collected MDI-M (1621-0051) - Collected MDI-H (1552-1621, 0051-0142) - Uplinked delayed load CEL020202301 ------------------ -- End of Report --