

SOHO DAILY REPORT

Operations Day - 315/2001 (11 November 01)
Mission Day 2172

SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC
Ref. #:  SH-FOT-DR-011111
=====================================================================
PASS #1	Madrid			DSS66		0627-1445
PASS #2	Goldstone		DSS27		1658-2042
PASS #3	Canberra		DSS46		2006-316/0650
*********************************************************************


PASS #1	Madrid			DSS66		0627-1445

Anomalies:

S01-0076  1324  VIRGO SPM-A and SPM-B sensors latched up for 21 minutes.
                 Impacts TBD.

NRT:

1244-1311

Activities Summary:

- SSR Dump
- Collected MDI-M (0828-0844)
- Collected MDI-H (0844-1430)
- Uplinked load NONCOHO_01315
- Uplinked delayed load VIRA11112
- Reaction Wheel Speed Monitoring Daily Adjustment
- CRS Drift Estimation Update
- Min/Max Data Collection (PROS)
- OBT Distribution to SWAN, CELIAS
- SSR SEF Reset
- SSR To Record
- Enabled ESR Warning and Experiment Off-pointing Flags for SUMER
- Executed CS V-02: VIRGO Latch-Up Recovery
------------------


PASS #2	Goldstone		DSS27		1658-2042

Anomalies:

G01-0443  2021  Corrupted command due to low uplink power delayed NRT
                 activities 5 minutes.

NRT:

1721-1735
1737-1803
1806-1951
1954-2020

Activities Summary:

- SSR Dump
- Collected MDI-M (1804-2005)
- Collected MDI-H (2005-2042)
------------------


PASS #3	Canberra		DSS46		2006-316/0650

Anomalies:

S01-0077  2241  CEPAC ESU data request error; recovered autonomously.  ESU
                 non-operational for three minutes.

NRT:

2045-2050
2103-0023
0051-0259

Activities Summary:

- Collected MDI-M (0300-0401)
- Collected MDI-H (2006-0300, 0401-0633)
- Min/Max Data Collection (PROS)
- OBT Distribution to SWAN, CELIAS
- Collected Ranging Data
- SSR SEF Reset
- SSR To Record
- Executed CS H-07: CEPAC ESU Data Request Error
------------------


-- End of Report --
