SOHO DAILY REPORT Operations Day - 341/2000 (6 December 00) Mission Day 1832 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-001206 ===================================================================== PASS #1 Canberra DSS46 0328-0627 PASS #2 Madrid DSS66 0624-1442 PASS #3 Goldstone DSS24 1606-2220 ********************************************* MDI 5 Day Continuous Campaign 341/0340-346/0450 PASS #1 Canberra DSS46 0328-0627 Anomalies: S00-0091 0554 CEPAC ESU Data Request Error; CEPAC recovered automatically after being non-operational for three minutes G00-0478 0618 Incorrect MDI transition. Immediately corrected by FOT - no negative impacts to instrument. NRT: None Activities Summary: - SSR Dump - Collected MDI-M (0353-0413) - Collected Ranging Data - Min/Max Data Collection (PROS) - OBT Distribution to SWAN, CELIAS - Executed CS H-07: CEPAC ESU Data Request Error Recovery - SSR Record ------------------ PASS #2 Madrid DSS66 0624-1442 Anomalies: None NRT: None Activities Summary: - Collected MDI-M (0630-0835) - Collected MDI-H (0835-1408) - New Tracking Star Slot 3/ Magnitude 6.55 - SSR Record ------------------ PASS #3 Goldstone DSS24 1606-2220 Anomalies: G00-0476 1400 D16 pass cancelled due to antenna problems resulting in an unplanned gap in the December MDI 5 day continuous campaign of 2 hours and 53 minutes. D66 extended pass and D24 track was added to replace D16 track. All data recoverable from SSR. DR# G06564 G00-0477 2202 D24 lost carrier due to transmitter mask. D16 was brought up for command purposes so the FOT could run the MDI transition procedure and the place the SSR in record for the upcoming gap in DSN coverage. Total commanding outage of 14 minutes. DR# G06567 NRT: 1702-1803 2015-2056 Activities Summary: - SSR Dump - Collected MDI-M (1701-1803) - Collected MDI-H (1803-2216) - Uplinked delayed loads VIRA01207 and SWA001206101 - Reaction Wheel Speed Monitoring Daily Adjustment - CRS Drift Estimation Update - SSR Record ------------------ -- End of Report --