SOHO DAILY REPORT Operations Day - 332/1999 (28 Nov 99) Mission Day 1458 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-991128 ===================================================================== PASS #1 Madrid DSS61 0657-1458 PASS #2 Goldstone DSS24 1433-2207 PASS #3 Canberra DSS42 2204-333/0659 ********************************************* PASS #1 Madrid DSS61 0657-1458 Anomalies: S99-0106 1155 ESR triggered by COBS ACU reset monitoring. Declared spacecraft emergency with DSN. Investigation in progress. Total impacts TBD. NRT: None Activities Summary: - Collected MDI-H (0657-1155) - Collected Ranging Data - Executed Contingency Script 06B (ESR Initial Operations) ------------------ PASS #2 Goldstone DSS24 1433-2207 Anomalies: None NRT: None Activities Summary: - Collected Ranging Data - Continued execution of Contingency Script 06B (ESR Initial Operations) - Executed Contingency Script 06A (ESR Recovery), Steps 1-5 - Executed OCD #1286 (CDS ESR Activities) - Uplinked delayed load CEL_ESR_SAFE_99332 ------------------ PASS #3 Canberra DSS42 2204-333/0659 Anomalies: G99-0633 0313 String 4 LAN router failed. String 4 inoperable from 0313 to 0457 while TSMs corrected the problem. NRT: None Activities Summary: - Collected Ranging Data - Continued execution of Contingency Script 06A (ESR Recovery), Steps 5-6 - Executed OCD #1286 (CDS ESR Activities) - OBT Distribution to SWAN, CELIAS ------------------ -- End of Report --