SOHO DAILY REPORT Operations Day -- 138/1999 (18 MAY 99) Mission Day 1264 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-990518 ===================================================================== PASS #1 Canberra DSS46 0408-0548 PASS #2 Madrid DSS61 0544-1648 PASS #3 Goldstone DSS16 1329-2134 PASS #4 Canberra DSS34 2130-0437 *** MDI Continuous Ops 13 MAR - 13 JUN 99 *** Pass #1 Canberra DSS46 0408-0548 Anomalies: None NRT: None Activities Summary: - SSR Dump - Collect MDI-M (0523-0535) - Collect MDI-H (0535-0548) - Min/Max Data Collection (PROS) - OBT Distribution to SWAN, CELIAS - SSR SEF Reset ---------------- Pass #2 Madrid DSS61 0544-1648 Anomalies: G99-0310 1310 TM Dropout; Madrid-JPL big pipe comm failure (26 min degraded TM, some recoverable) DR# N50997 S99-0045 1410 CDS MCP Voltage violated Red Low limit NRT: 0954-1102 1107-1111 1114-1212 1227-1238 Activities Summary: - Collect MDI-H (0544-1648) - Uplink Delayed Load (CEL990518301) - Min/Max Data Collection/Reset (AOCS) - Momentum Management maneuver - SSR SEF Reset -------------------- Pass #3 Goldstone DSS16 1329-2134 Anomalies: G99-0311 1710 Prime POCC String 1 crashed NRT: 1858-2132 Activities Summary: - Collect MDI-M (1824-1942) - Collect MDI-H (1329-1824, 1942-2134) - Dump LOI Buffer - Uplink Delayed Load (VIRA90519) - Uplink RSL Table - SSR SEF Reset -------------------- Pass #4 Canberra DSS34 2130-0437 Anomalies: None NRT: 2142-0054 Activities Summary: - Collect MDI-M (0100-0202) - Collect MDI-H (2130-0100, 0202-0419) - Dump LOI Buffer - Uplink Delayed Load (CEL990519301) - Min/Max Data Collection (PROS) - OBT Distribution to SWAN, CELIAS - SSR SEF Reset - SSR to Record -------------------- -- End of Report --