SOHO DAILY REPORT Operations Day -- 054/1999 (23 FEB 99) Mission Day 1180 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-990222 ===================================================================== PASS #1 Madrid DSS61 0744 - 1138 PASS #2 Goldstone DSS24 1517 - 2335 Pass #1 Madrid DSS61 0744 - 1138 Anomalies: G99-0130 0701 Pocc string 2 workstation 1 froze up. Reboot required. S99-0015 0244 STXLVPSB tripped Red High limit. Sumer s/c LCL powered OFF and ON reboot instrument. Pass extended 35 min. G99-0131 1115 7.5 Min TM outage due to coherency switch. NRT: 0853 - 0954 1031 - 1115 Activities Summary: - SSR Dump - Collect MDI-M (0755 - 0807,1026 - 1059) - Collect MDI-H (1059 - 1125) - Ranging Data Collection - Sumer LCL Toggling - SSR SEF Reset - SSR To Record -------------------- Pass #2 Goldstone DSS24 1517 - 2335 Anomalies: G99-0132 1652 1 Min commanding delay. Cmd lost in transmission. Retransmitted G99-0133 1826 9 Min TM outage. Std Mon 30 triggered. DR#G-04648. NRT: 1557 - 1710 1717 - 1828 1852 - 2319 Activities Summary: - SSR Dump - Collect MDI-M (1715 - 1820) - Collect MDI-H (1820 - 1842,1850 - 2320) - Uplink Delayed Load (VIRA90222,NONCOHO_99052) - Min/Max Reset (SSU) - SSR SEF Reset - SSR To Record -------------------- -- End of Report --