SOHO DAILY REPORT Operations Day -- 292/1998 (19 OCT 98) Mission Day 1053 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-981019 ===================================================================== PASS #1 Canberra DSS42 0633 - 0920 PASS #2 Madrid DSS54 0909 - 1135 PASS #3 Madrid DSS66 0908 - 1135 PASS #4 Goldstone DSS24 1641 - 293/0021 PASS #5 Canberra DSS34 2358 - 293/0845 Pass #1 Canberra DSS42 0633 - 0920 Anomalies: None NRT: None Activities Summary: - SSR Dump - SSR SEF Reset - OBT Distribution to Swan -------------------- Pass #2 Madrid DSS54 0909 - 1135 Anomalies: None NRT: None Activities Summary: - Demo track -------------------- Pass #3 Madrid DSS66 0908 - 1135 Anomalies: G98-0723 1012 2 False ACU Anomalies reported on Backup string only. NRT: None Activities Summary: - SSR SEF Reset - SSR To Record -------------------- Pass #4 Goldstone DSS16 1641 - 293/0021 Anomalies: G98-0724 1744 Ranging not performed. Unable to lock receiver 1. DR #G04204. G98-0725 1712 Lost Voice Lines @ JPL. DR not received at this time. Performed Resweeps for ranging (AR G98-0724 by relaying thru Ops Chief). G98-0726 1817 Big Pipe failed at Goldstone. Asked to stop flowing high rate while on Little pipe. Delayed completion of VC4 dump and MDI high rate. DR # N-48726. Total of 7 Min TM lost. G98-0727 1914 TM dropouts caused by SCP at Station. DR #04205 NRT: 1822 - 1922 1944 - 1946 1951 - 2008 2010 - 2027 2228 - 2341 Activities Summary: - SSR Dump - SSR SEF Reset - Uplink delayed loads (VIRA81020) - Adjusted CDS heater duty cycle - Collection and Reset of Min/Max parameters (SSU) - LV B closed. Branch B data collection -------------------- Pass #5 Canberra DSS34 2358 - 293/0845 Anomalies: G98-0728 0626 30 Sec TM Dropout. R/T and MDI-M. Recoverable. NRT: 1708 - 1709 1730 - 1824 1828 - 1930 1933 - 292/0049 Activities Summary: - SSR Dump - SSR SEF Reset - SSR To Record - OBT Distribution to Swan - Collection of Min/Max parameters (PROS) -------------------- -- End of Report --