SOHO DAILY REPORT Operations Day -- 290/1998 (17 OCT 98) Mission Day 1051 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-981017 ===================================================================== PASS #1 Madrid DSS54 0910 - 1135 PASS #2 Madrid DSS66 0905 - 1140 PASS #3 Goldstone DSS16 1810 - 290/0125 Pass #1 Madrid DSS54 0910 - 1135 Anomalies: None NRT: None Activities Summary: - Demo Track -------------------- Pass #2 Madrid DSS66 0901 - 1140 Anomalies: None NRT: None Activities Summary: - SSR SEF Reset - SSR To Record - SSU SEU Recovery (continued from previous pass) -------------------- Pass #3 Goldstone DSS16 1810 - 290/0125 Anomalies: G98-0719 1814 Two resweeps required for ranging, 8 min delay in activities. S98-0085 1852 SSU SEU, in RMW for 18 mins. G98-0720 2045 Thermal mon channel 87 limits not correct. Change required from PROM values. S98-0086 2111 SSU SEU, in RMW for 23 mins. NRT: 2025 - 2035 2046 - 2052 2103 - 2111 2113 - 2116 2204 - 2312 2314 - 291/0102 Activities Summary: - SSR Dump - SSR SEF Reset - SSR To Record - Uplink delayed loads (VIRA81018) - SSU SEU Recovery (twice) - CDS turn ON - New guide star, mag 6.7 - New tracking star, mag 4.7 - Collection and Reset of Min/Max parameters (SSU) -------------------- -- End of Report --