SOHO DAILY REPORT Operations Day -- 042/1998 (11 FEB 98) Mission Day 803 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-980211 ===================================================================== PASS #1 Madrid DSS61 0649 - 1443 PASS #2 Goldstone DSS16 1425 - 1944 PASS #3 Goldstone DSS46 1934 - 2038 PASS #4 Canberra DSS42 2028 - 042/0657 *** MDI 3-month Continuous Campaign in progress *** Pass #1 Summary --------------------- Anomalies: G98-0158 1049 1 Min 13 Sec TM Dropout. TCA Problem. Nonrecoverable NRT: 1458 - 1551 Activity Summary: - Collect MDI-M (1231 - 1333) - Collect MDI-H (0651 - 1231, 1333 - 1601) - Uplink RSL Table - Uplink Delayed Load (VIRA80212) - MDI LOI dump - SSR SEF Reset Pass #2 Summary --------------------- Anomalies: None NRT: 1607 - 1946 Activity Summary: - Collect MDI-H (1555 - 1953) - SSR SEF Reset Pass #3 Summary --------------------- Anomalies: S98-0011 2142 Single DMA Over 1 Format. Sumer Packet Missing NRT: 2001 - 2344 Activity Summary: - Collect MDI-H (1944 - 2344) - SSR SEF Reset Pass #4 Summary --------------------- Anomalies: None NRT: 0144 - 0329 Activity Summary: - Collect MDI-M (0040 - 0142) - Collect MDI-H (2328 - 0040, 0142 - 0657) - OBT Distribution to Swan/Celias - Collect Min/Max Parameters - SSR SEF Reset -- End of Report --