SOHO DAILY REPORT Operations Day -- 144/1997 (24 MAY 97) Mission Day 540 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-970524 ===================================================================== The 3-month continuous operations period started on day 103 at 1105 UT, and will continue until day 195 at 0050 UT. PASS #1 Canberra DSS46 0202 - 0259 PASS #2 Canberra DSS42 0237 - 0705 PASS #3 Madrid DSS61 0654 - 1742 PASS #4 Goldstone DSS24 1735 - 2019 PASS #5 Goldstone DSS27 2005 - 145/0213 Pass #1 Summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-H (0202 - 0259) Pass #2 summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-H (0237 - 0705) - OBT Distribution to Celias/Swan - Collect Min/Max Parameters - SSR SEF Reset Pass #3 summary --------------------- Anomalies: S97-0075 144/1205 CEPAC ESU Data Request Error G97-0369 144/1709 TM Dropout due to heavy rain at D61 (3 min, recoverable) G97-0370 144/1634 Commanding problems at D61 (NRT paused several mins) S97-0076 144/1650 Single COBS DMA failure over one format NRT: 1251 - 1329 1336 - 1427 1458 - 1532 1547 - 1635 1648 - 1709 1711 - 1714 1718 - 1736 Activity Summary: - Collect MDI-M (1330 - 1432) Via TSTOL Procedure - Collect MDI-H (0654 - 1330, 1432 - 1742) - CEPAC ESU Data Request Error Recovery - Uplink RSL Table - Uplink Delayed Loads (VIRA70525) - Uplink SVM Loads (TTMH_TOMM_97144, MDI_LOI_97144, TTMM_TOMH_97144) - SSR SEF Resets Pass #4 summary --------------------- Anomalies: G97-0371 144/1930 POCC Prime String #2 crashed (CPU-B failure) NRT: None Activity Summary: - Collect MDI-H (1735 - 2019) - SSR SEF Reset Pass #5 summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-M (145/0100 - 0201) Via TT Commands - Collect MDI-H (2005 - 145/0100, 0201 - 0213) - Uplink Delayed Load (CEL970524301) - SSR SEF Reset -- End of Report --