SOHO DAILY REPORT Operations Day -- 127/1997 (07 MAY 97) Mission Day 523 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-970507 ===================================================================== The 3-month continuous operations period started on day 103 at 1105 UT, and will continue until day 195 at 0050 UT. PASS #1 Canberra DSS46 0246 - 0402 PASS #2 Canberra DSS42 0350 - 0724 PASS #3 Madrid DSS61 0708 - 1801 PASS #4 Goldstone DSS24 1755 - 2337 PASS #5 Goldstone DSS27 2335 - 128/0302 Pass #1 Summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-H (0246 - 0402) Pass #2 summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-H (0350 - 0724) - OBT Distribution to Celias/Swan - Collect Min/Max Parameters - SSR SEF Reset Pass #3 summary --------------------- Anomalies: None NRT: 1435 - 1753 Activity Summary: - Collect MDI-M (1330 - 1434) Via TSTOL Procedure - Collect MDI-H (0708 - 1330, 1434 - 1801) - Uplink RSL Table - Uplink Delayed Load (VIRA70508) - Uplink SVM Loads (TTMH_TOMM_97127, TTMM_TOMH_97127, MDI_LOI_97127) - SSR SEF Reset Pass #4 summary --------------------- Anomalies: S97-0066 127/2246 Single DMA Failure over one format NRT: 1806 - 2320 Activity Summary: - Collect MDI-H (1755 - 2337) - Uplink Delayed Loads (CEL970507301, CEL970507302, CEL970507303) - SSR SEF Reset Pass #5 summary --------------------- Anomalies: G97-0326 127/2325 Equipment problem at DSS27 (Commanding delayed 10 mins) NRT: None Activity Summary: - Collect MDI-M (0100 - 0201) Via TT Load - Collect MDI-H (2335 - 128/0100, 0201 - 0302) - SSR SEF Reset -- End of Report -- ******************************** To be removed from this list: --Send a message to macjordomo@sohosched.gsfc.nasa.gov message body should read: unsubscribe SOHOFOT-Reports ******************************** To be added to the list: --Send a message to macjordomo@sohosched.gsfc.nasa.gov message body should read: subscribe SOHOFOT-Reports ********************************