SOHO DAILY REPORT Operations Day -- 341/1100 - 342/1100 (7-8 Dec) 1995 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-951208 =========================================================== DATA LOSSES: 1846-1849: Realtime data lost due to stn CPA problem 0400-0501: Several momentary dropouts PASS ACTIVITIES SUMMARY: PASS 1. SSR DUMP SUPPORT TIMES: 0840-1336 STATION: D66 Nominal SSR dump. S/C nominal. PASS 2. SSR DUMP, Experiment Power-ON (SWAN, CEPAC, LASCO/EIT), Guide Star Update/CCD Test SUPPORT TIMES: 1545-2331 STATION: D16 Nominal. SWAN powered ON. NRT: 1633-44. CEPAC powered ON. Set ESR Warning flag for experiments: UVCS, CEPAC, SWAN, and MDI. Performed OCD 48: MDI Oven Thermal control Monitoring. Performed guide star change to Mv 3 double star and released all others for CCD background level checkout. LASCO/EIT powered ON. Loaded 7-day HGA Nominal Control table good until 14 Dec/2000. Performed additional manual OBT correlations. Delta appears to be fairly steady at approximately 38-39 msec. fast. Handover to D42 at 2249. PASS 3. SSR DUMP, LASCO Power Recycle SUPPORT TIMES: 2255-0735 STATION: D42 Nominal S/C. SSR dump nominal. Some problems at station with uplink. TRSP2 lost lock several times. D42 requested expanding their tracking bandwidth from 1200 to 4800 Hz. DR opened. LASCO processor hung. Ran OCD 52 to cycle LASCO LEB power at 0430 - successful. NRT up at 0455. Lost D/L at site at 0501 briefly - expect same problem as before. Continued LASCO NRT. LASCO requested OBT dist. - executed at 0549. SSR->record @ 0719. Stn S/S=-107dB. PASS 4. SSR DUMP SUPPORT TIMES: 0840-1336 STATION: D66 Nominal SSR dump. S/C nominal.