next up previous
Up: SOHO-JOP015 Previous: Operational Considerations

Operational Sequences

The operational sequences described include the mapping sequences for both instruments. These, albeit necessary, are not part of the high velocity event study.

Furthermore, in setting SUMER parameters we have only included one of the two alternate lines for the JOP, i.e. the Si IV 1393 A line. Using the O IV 790 A line will require some modification to entries of reference pixel and image format.



SOHO Archive
Tue Aug 6 15:21:19 EDT 1996